Sinopec's global first 10,000-ton green hydrogen project has a capacity of hydrogen production of 20,000t/a through water electrolysis, a hydrogen storage capacity of 210,000Nm3, and a hydrogen transmission capacity of 28,000Nm3/h. All the 20,000 tons of green hydrogen produced each year are supplied to SINOPEC Engineering (Group) Co. , Ltd. nearby to replace the hydrogen from natural gas used in refining and processing, promoting zero breakthroughs in the large-scale industrial application of green hydrogen in China 91视频播放. .
After an open competition, LONGi Hydrogen successfully won the bid in May 2022 and provided 16 sets of 1,000Nm3/h alkaline water electrolyzers, gas-liquid separators, and hydrogen purification units for this project. For the first time, it achieved the "four-to-one" system application of 4 electrolyzers to 1 gas-liquid separation unit. Adhering to the original intention of the "customer-centric" concept, LONGi Hydrogen completed the production and assembly of the equipment in just 85 days and took the lead in delivery www91. .
All hydrogen production equipment was installed in April 2023, qualified hydrogen was produced in June, and full-load operation was achieved in late July, giving a satisfactory answer to Sinopec 91视频网站在线观看. .